EasyManua.ls Logo

Manitowoc Grove GMK 5250L

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rigging work
11.11 Other rigging work
11 - 130 3 302 633 en Operating Instructions GMK5250L
27.09.2017
(A) – Folding out
Release the locking bar (2) and swing the
railing (1) outward until it engages.
(B) – Folding in
Release the locking bar (2) and swing the
railing (1) inward until it engages.
11.11.2 Folding the lighting carrier in/out
You can fold in the lighting carrier when performing rigging work on the
hoists.
(A) – Folding in for rigging work
Pull the locking bar (1) and fold in the
lighting carrier (2).
(B) – Folding out for driving and crane
operation
Pull the locking bar (1) and fold out the
lighting carrier (2).
G
Risk of accidents due to inadequate lighting!
Always fold out the lighting carrier for driving and crane operation. This
prevents accidents due to inadequate lighting on the superstructure.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Related product manuals