Rigging work
11.9 Rigging/unrigging the counterweight
Operating Instructions GMK5250L 3 302 633 en 11 - 75
27.09.2017
6. Enter the current rigging mode with the new rigged counterweight
combination at the RCL display;
à p. 10 - 32.
7. Only switch on the slewing gear if slewing is permissible for the current
outrigger span;
à Slewing with the rigged counterweight, p. 11 - 93.
11.9.6 CHECKLIST: Unrigging the counterweight
H
This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
1. The truck crane is stabilised with the outrigger span required for crane
work according to the
load capacity chart; Ã Enabled outrigger spans,
p. 11 - 28.
2. If required, remove the auxiliary hoist;
à CHECKLIST: Removing the
auxiliary hoist
, p. 6 - 57.
3. Slew the superstructure into the
0° to the rear position and lock;
à Braking the slewing movement, p. 10 - 118,
à Locking/unlocking the superstructure, p. 10 - 15.
s
G
Danger of overturning when slewing with a rigged counterweight!
Before slewing with the rigged counterweight, check whether slewing is
permissible with the rigged outrigger span;
à Slewing with the rigged
counterweight
, p. 11 - 93.