EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L User Manual

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #709 background imageLoading...
Page #709 background image
Rigging work
11.1 Rigging work checklists for crane operation with the main boom
Operating Instructions GMK5250L 3 302 633 en 11 - 1
27.09.2017
11 Rigging work
If the truck crane on the site has already been rigged, proceed according to
the
CHECKLIST: Checks before operating the crane, p. 10 - 1.
11.1 Rigging work checklists for crane operation with the
main boom
H
This checklist is not a complete operating manual. There are accompanying
instructions, which are indicated by cross-references.
Observe the warnings and safety instructions there!
11.1.1 CHECKLIST: Rigging
1. Choose a suitable site; à Selecting the suitable site, p. 11 - 9.
2. Check that the parking brake is applied – if necessary, apply the parking
brake.
3. If the main boom is resting on a dolly:
– Switch off the boom floating position;
à p. 11 - 17,
– Switch off the slewing gear freewheel;
à p. 11 - 18,
– If necessary, switch off boom pre-tensioning;
à p. 11 - 19.
s

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals