EasyManuals Logo

Manitowoc Grove GMK 5250L User Manual

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #710 background imageLoading...
Page #710 background image
Rigging work
11.1 Rigging work checklists for crane operation with the main boom
11 - 2 3 302 633 en Operating Instructions GMK5250L
27.09.2017
4. Check whether the ground will support the maximum occurring outrig-
ger pressures;
à Determining the required load-bearing area, p. 11 - 9.
5. Switch off (lock) the suspension.
The symbol must be red (suspension off);
à p. 5 - 16.
6. Support the truck crane with the outrigger span required for the job
according to the
Lifting capacity table and raise until none of the wheels
is touching the ground;
à Outrigger operation, p. 11 - 37.
7. Align the truck crane horizontally.
The lamp (1) lights up in the measuring range 1°;
à p. 11 - 58.
8. Turn off the engine and remove the hand-held control;
à Starting/turning off the engine with the hand-held control, p. 11 - 23,
à Disconnecting the hand-held control, p. 11 - 22.
9. Earth the truck crane, if necessary;
à Earthing the truck crane, p. 11 - 13.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals