Rigging work
11.1 Rigging work checklists for crane operation with the main boom
Operating Instructions GMK5250L 3 302 633 en 11 - 3
27.09.2017
10. Fold out all ladders and extend all stair treads;
à Ladders, p. 4 - 5,
à Step at the crane cab, p. 11 - 141.
11. Inspect the truck crane, while looking out in particular for any leaking
fluids (oil, fuel or water).
12. Start the engine for crane operation;
à p. 9 - 5.
13. If necessary, switch off the houselock and unlock the superstructure;
à Switching off the houselock, p. 10 - 19,
à Unlocking the superstructure, p. 10 - 16
14. Pick up the hook block and reeve the hoist rope again, if necessary;
à Hook block on a separate vehicle, p. 11 - 99,
à Hook block on the bumper, p. 11 - 95,
à Reeving and unreeving the hoist rope, p. 11 - 104.
s

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals