EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L User Manual

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #712 background imageLoading...
Page #712 background image
Rigging work
11.1 Rigging work checklists for crane operation with the main boom
11 - 4 3 302 633 en Operating Instructions GMK5250L
27.09.2017
15. Install the lifting limit switch; à p. 11 - 120.
16. Install anemometer, air traffic control light and camera on main boom;
à Anemometer and air traffic control light, p. 11 - 126,
à Camera on main boom, p. 11 - 137.
17. Perform all the required checks prior to crane operation;
à CHECKLIST: Checks before operating the crane, p. 10 - 1.
18. Enter and confirm the current rigging mode;
à p. 10 - 32.
19. With the RCL adjusted accordingly, rig the counterweight combination
required for the operation according to
Lifting capacity table;
à CHECKLIST: Rigging the counterweight, p. 11 - 74.
20. If required, mount the auxiliary hoist;
à CHECKLIST: Installing the
auxiliary hoist
, p. 6 - 55.
21. Enter the current rigging mode with the new rigged counterweight
combination at the RCL display;
à p. 10 - 32.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals