Driving modes and rigging for on-road driving
6.6 Rigging the auxiliary hoist
6 - 70 3 302 633 en Operating Instructions GMK5250L
27.09.2017
Rigging the hoist rope
The rigging aid is connected to the hoist rope.
– When rigging
• Guide the rope (1) over the main boom
and over the upper head sheave.
• Slowly unreel the hoist rope.
• Use the rope (1) to keep the hoist rope
tensioned so that no slack rope occurs.
– When unrigging
• Slowly reel in the hoist rope.
• Use the rope (1) to keep the hoist rope
tensioned so that no slack rope occurs.
Disconnecting a connection
• Remove the rope (4).
• Disconnect part (2) and (3) of the connector
and remove the hoist rope (1).
• Store the rigging aid so that it is safe for
transport, under the passenger's seat if
possible.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals