EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L User Manual

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #387 background imageLoading...
Page #387 background image
Malfunctions in driving mode
7.5 Emergency operation and breakdown assistance
Operating Instructions GMK5250L 3 302 633 en 7 - 35
27.09.2017
Inflating the tyres The maximum operation pressure of the compressed air system of 8 bar
(116 psi) can only be reached with the engine running.
• Start the engine; à p. 4 - 14.
• Fasten the tyre connection (1) to the tyre
valve.
• Press the button on the tyre connection and
inflate the tyre.
• Disconnect the tyre connection (1) from the
tyre valve.
Remove the
filling hose
Before driving, you must remove the filling hose from the filler connection.
• Remove the connection (1) from the filler
connection (2).
• Close the filler connection and the connec-
tion with the caps (3) and (4).
• Stow the filling hose away.
• Drive to a service station or repair shop and
adjust the tyre pressure.
S
Risk of damage to the compressed air system!
Always close the filler connection with the cap.
This prevents damage to the compressed air system and contamination
of it.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals