EasyManua.ls Logo

Manitowoc Grove GMK 5250L

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Operating elements for crane operation
8.2 Brief description of the operating elements
8 - 138 3 302 633 en Operating Instructions GMK5250L
27.09.2017
RCL override –
version B
This point only applies to RCL programming deviating from EN 13000.
For RCL programming in accordance with EN 13000;
à p. 8 - 137.
Overriding the RCL in an emergency
No function
No function
1 Press once:
RCL shutdown overridden – crane functions
enabled
Crane functions can be started within the next
10 seconds.
Speed of movements increasing load moment
max. 15%.
à RCL override – version B, p. 10 - 67

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Related product manuals