Crane operation
10.4 Operation of the rated capacity limiter
Operating Instructions GMK5250L 3 302 633 en 10 - 39
27.09.2017
The confirmed boom system (1) or (2) is
displayed.
Reeving
(A) – Select and confirm the display for the
hoist to be used for lifting the load, e.g.
display (1) for the main hoist – symbol (3)
is orange.
(B) – Select the currently rigged reeving (2),
e.g. 8-fall.
Confirm the selection – symbol (3) is grey.