EasyManua.ls Logo

Manitowoc Grove GMK 5250L

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Crane operation
10.5 Crane operation with main boom
10 - 114 3 302 633 en Operating Instructions GMK5250L
27.09.2017
Hoists High-speed mode is always switched on and off simultaneously for the
main hoist and the auxiliary hoist.
To switch on briefly
Press the button at the left on – for (1).
High-speed mode will be active until you release the button.
Continuous operation
Press the button at the right on – for (2).
High-speed mode will be enabled until you press the button again.
The symbol (1) indicates the current status:
The symbols show the direction of rotation of the hoist:
H
The speed of the hoists will only be significantly increased by switching to
high-speed mode if you have deflected the control lever by more than 70%.
S
Risk of accidents due to overloading!
Make sure the lifted load is no more than 50% of the maximum load accord-
ing to the
Lifting capacity table (maximum degree of utilisation of 50%)
before operating the hoists in high-speed mode.
S
Danger of slack rope with a lightweight hook block!
If you switch on high-speed mode at high speeds, a light hook block will not
be able to keep the hoist rope taut if it is hoisted up high with a small
number of reevings and a large boom length.
S
Danger of slack rope with large number of reevings
If you switch on high-speed mode with a large number of reevings and
without a load, slack rope may form because the hook block is lowered too
slowly due to the high degree of friction.
–On: High-speed mode switched on
Off: High-speed mode switched off
1 Lifting the hoist
2 Lowering the hoist

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Related product manuals