Crane operation
10.9 Heating and air-conditioning system
10 - 152 3 302 633 en Operating Instructions GMK5250L
27.09.2017
Setting the
temperature
• Select the symbol (1).
• Set the desired temperature – Symbol (2).
• Change and confirm the respective values
using the controls (3) or (4).
Setting the
heating start/
heating duration
• Select a weekday – symbol (1).
• Set the starting time for the heating –
Symbol (3). You can set up to three starting
times.
• Set the desired heating duration – Symbol (4).
You can set a maximum heating duration of 2
hours.
• Set the desired temperature – Symbol (2).
• Change and confirm the respective values
using the controls (5) or (6).

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals