Rigging work
11.10 Rigging work on the main boom
11 - 98 3 302 633 en Operating Instructions GMK5250L
27.09.2017
Setting down the hook block
Slacken the hoist rope until the hook
block (1) rests on the end stop (2).
Hook block:
Unreeve the hoist rope from the hook
block (3);
à Reeving and unreeving the hoist
rope
, p. 11 - 104.
Hook block, separable:
Separate the sheave package from the hook;
à Hook block, separable, p. 11 - 102.
Secure the hook block with the lashing
straps.