EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L User Manual

Manitowoc Grove GMK 5250L
958 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #835 background imageLoading...
Page #835 background image
Rigging work
11.10 Rigging work on the main boom
Operating Instructions GMK5250L 3 302 633 en 11 - 127
27.09.2017
Depending on the additional equipment, the
truck crane can be equipped with a switchable
air traffic control light.
This air traffic control light (1) has
flashing light
and
constant light lighting modes.
• Select the desired lighting mode using the
switch (2).
Switching on/off
Removing You must remove the rod with the anemometer/air traffic control light
before driving on the road.
• Switch off the air traffic control light.
• Remove the plug and close the sockets (4)
and (5) with the protective caps.
• Wind the cable on to the holder (2).
• Remove the rod (1) from the holder (3).
s
To switch on: Select symbol (1) and confirm – symbol ON is displayed
To switch off: Select symbol (2) and confirm – symbol OFF is displayed

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals