EasyManua.ls Logo

ROPA Maus 6 - Build-Up Welding

Default Icon
546 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance and Service
Pickup
7.8.4.7 Build-up welding
The welding material must be only applied to the conveyor side of the roller spirals on
the conveyor and pinch rollers. Never manually apply a build-up welding bead directly
on the roller tube. The heat will affect the complete roller and it will become unusable.
1
Note that the built-up spirals (1) on the conveyor rollers must never be higher than
max. 20 mm.
2
Note that the built-up spirals (2) on the pinch roller must never be higher than max.
18 mm.
Build-up welding must always be done by machine to ensure that the surface of the
weld is smooth and to prevent damage to the beets. This work can be done profes-
sionally and cost-effectively at many ROPA service centres.
We recommend ROPA SCREWTEC special filling wire with a diameter of 1.6 mm for
build-up welding. It is applied at the factory and can be ordered in 15 kg rolls at ROPA
item no. 017013600.
ADVICE
Also check the wear of the roller tube before any further actions.
The build-up welding often lasts so long that the roller tube is also worn out if the hard
welded-on finish is worn. Replacement of the worn roller with a new one is then the
most cost-effective solution in this case.
406 / 546

Table of Contents

Related product manuals