Lists/Tables/Plans/Diagrams/Maintenance Verification
Maintenance table
Maintenance interval
Maintenance work
before har-
vest
start daily
after the
first 50
oper. hrs.
every 50
oper. hrs.
after the
first 500
oper. hrs.
every 500
oper. hrs.
when
needed
annu-
ally
Recleaner version with 8-set pinch rollers
Check oil level in the gears for 8-part
pinch rollers
X X
Change oil in the gears for 8-part pinch
rollers
X X X
Recleaner version stone remover
Check tension of sieve conveyor and
adjust if necessary
X X
Replace drive wheels Depending on soil conditions every 100,000 - 200,000 t of loading
Check pretension of the pinch rollers X X X
Truck conveyor
Check tension of sieve conveyor and
adjust if necessary
X X X
Replace drive wheels Depending on soil conditions every 80,000 - 180,000 t of loading X
Remove dirt accumulated on the scales X X
All belts, conveyor tunnels and the remaining machine
Remove soiling
and sticking dirt
X X
Check all rollers (do they rotate freely?) X
Refill grease container X
Grease lubricating points according to lubricating plan
Retighten wheel bolts 450 Nm after the first 10 and the first 50 oper. hrs.
Check tyre pressure X X
Air conditioning system
Check condenser for soiling, possibly
clean
X X
Check hoses and lines for chafe marks
(visually), possibly have them
exchanged
X X X
Check coolant, possibly have refilled X X
Have the air conditioning system
checked by a qualified workshop and, in
case of need, repaired
X X
Have the collector dryer and coolant
replaced
every 2 years