EasyManua.ls Logo

ROPA Maus 6 - Page 506

Default Icon
546 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Lists/Tables/Plans/Diagrams/Maintenance Verification
Maintenance table
Maintenance interval
Maintenance work
before har-
vest
start daily
after the
first 50
oper. hrs.
every 50
oper. hrs.
after the
first 500
oper. hrs.
every 500
oper. hrs.
when
needed
annu-
ally
Recleaner version with 8-set pinch rollers
Check oil level in the gears for 8-part
pinch rollers
X X
Change oil in the gears for 8-part pinch
rollers
X X X
Recleaner version stone remover
Check tension of sieve conveyor and
adjust if necessary
X X
Replace drive wheels Depending on soil conditions every 100,000 - 200,000 t of loading
Check pretension of the pinch rollers X X X
Truck conveyor
Check tension of sieve conveyor and
adjust if necessary
X X X
Replace drive wheels Depending on soil conditions every 80,000 - 180,000 t of loading X
Remove dirt accumulated on the scales X X
All belts, conveyor tunnels and the remaining machine
Remove soiling
and sticking dirt
X X
Check all rollers (do they rotate freely?) X
Refill grease container X
Grease lubricating points according to lubricating plan
Retighten wheel bolts 450 Nm after the first 10 and the first 50 oper. hrs.
Check tyre pressure X X
Air conditioning system
Check condenser for soiling, possibly
clean
X X
Check hoses and lines for chafe marks
(visually), possibly have them
exchanged
X X X
Check coolant, possibly have refilled X X
Have the air conditioning system
checked by a qualified workshop and, in
case of need, repaired
X X
Have the collector dryer and coolant
replaced
every 2 years
506 / 546

Table of Contents

Related product manuals