EasyManua.ls Logo

ROVEMA CMK - User Manual

ROVEMA CMK
209 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
ROVEMA Packaging Machines L.P.
650 Hurricane Shoals Road, NW
Lawrenceville, GA 30045
Phone: 770-513-9604
Fax: 770-513-0814
http://www.rovema.com
CMK
Continuous Motion Cartoner
Operator’s Manual
Customer:
Machine: 200246
Order No.: 39077

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the ROVEMA CMK and is the answer not in the manual?

Summary

Introduction to the CMK Cartoner

About this Manual

Explains how to find information within the operator's manual.

Symbol Descriptions

Defines the meaning of symbols used throughout the manual for clarity.

Introduction to the CMK

Overview of the CMK continuous motion cartoner's purpose and function.

Main Areas of the CMK

Identifies the primary physical sections of the CMK machine.

Safety Instructions for CMK Operation

Operator Safety Guidelines

Essential safety rules for personnel operating the machine.

Component Safety Measures

Ensuring safety related to electrical systems, spare parts, and maintenance.

Safety Devices and Their Function

Details on safety devices, their testing, and operational requirements.

Lockout Procedures for Maintenance

Steps for safely locking out air and electrical power supplies.

Functional Descriptions of CMK Operations

Variable and Fixed Side Identification

Explanation of the machine's variable and fixed sides for adjustments.

Key Terms and Definitions

Defines critical terms like Carton Production and Case Production.

Carton Handling: Transporting and Storage

Guidelines for transporting and storing cartons to ensure quality.

Carton Considerations and Issues

Addresses potential problems with cartons like dimensions, folds, and scoring.

Gluing Considerations for Carton Sealing

Details on glue properties, temperature, open time, and application.

CMK Machine Parts and Functions

Sequence of Operations Overview

Illustrates the step-by-step process from carton blank to finished carton.

Carton Supply Mechanism

Describes the system that feeds carton blanks into the machine.

Carton Magazine Operation

Explains how carton blanks are stored and fed from the magazine.

Carton Erector Functionality

Details the components and process of erecting carton blanks.

Carton Conveyor System

Describes the chain system used to move erected cartons through the machine.

Bucket Conveyor for Product Feed

Explains the bucket conveyor's role in feeding products into cartons.

Gluing Station Operation

Details the hot melt glue application process for closing cartons.

Drying Zone for Glue Curing

Explains the purpose of the drying zone in ensuring sealed flaps.

Carton Removal Chain Mechanism

Describes the chain that moves completed cartons to downstream equipment.

Operator Controls and Interface

HMI (Human-Machine-Interface) Overview

Introduction to the touchscreen interface and its primary sections.

Menu Tree Navigation

Explains the structure and access points of the HMI menu tree.

Parameters and Submenus

Details on how parameters control machine operations and submenus.

Main Parameters Descriptions

Describes key parameters affecting machine functions like speed and timing.

Carton Magazine Parameter Settings

Screens and descriptions for configuring the carton magazine feed.

PLS Timing Channels Configuration

Screens for setting PLS parameters related to carton handling and detection.

Bag Transfer Station Parameters

Screens and descriptions for operating and configuring bag transfer stations.

Bagger Synchronization Settings

Information on synchronizing the cartoner with upstream baggers.

Cartoner Glue Setup Screen

Interface for enabling and configuring glue zones on the CMK.

Checkweigher Feedback Screen

Settings for processing carton weight feedback from the checkweigher.

Additional HMI Screens

Access to other HMI screens like Adjustments, Servo, and Batch Control.

Machine Buttons and Switches

Description of primary operator interface buttons and switches.

Operating Procedures for the CMK

Machine Startup Procedure

Steps for initial machine setup and commissioning.

Activating the Machine

Procedure for powering up and preparing the machine for operation.

Set Up and Adjustments

Guidance on initial setup and making mechanical adjustments.

Routine Operations and Monitoring

Procedures for normal production runs and monitoring machine status.

Machine Shut Down Procedures

Steps for normal and extended shutdown of the machine.

Emergency Stop Procedures

Handling and recovery from emergency stop situations.

Product Rejection Stations

Locations and functions of product rejection points within the system.

Working with CMK Components

Set Up and Mechanical Adjustments

Guidelines for adjusting machine components for new carton sizes.

Carton Dimensions and Dial Settings

Illustrates carton dimensions and their relation to machine dial settings.

Carton Supply Adjustments

Procedures for adjusting the carton guide and conveyor tension.

Carton Magazine Adjustments

Instructions for adjusting the retaining roller and pushers.

Main Drive Chain Setup

Details on base setting and tensioning the main drive chain.

Carton Chain Adjustments

Procedures for adjusting carton chain drivers, base setting, and tension.

Barrel Loader Component Adjustments

Instructions for adjusting upper conveyor height and insertion slides.

Flap Closer Adjustments

Details on setting flap closer base settings and drive belt tension.

Glue Device Adjustments

Procedures for adjusting glue head height and distance from carton.

Drying Zone Adjustments

How to adjust the drying zone rods for proper carton movement.

Guide Adjustments

Instructions for adjusting flap guides to match carton dimensions.

Bucket Conveyor Adjustments

Procedures for adjusting bucket size, base setting, and conveyor tension.

Carton Removal Chain Adjustments

Details on base setting and tensioning the carton removal chain.

Machine Maintenance Procedures

General Maintenance Guidelines

Importance of regular and scheduled maintenance for machine longevity.

Cleaning Intervals and Agents

Recommendations for cleaning frequency and suitable cleansing agents.

Daily Maintenance Tasks

Routine checks and cleaning performed at the start and end of the day.

Weekly Maintenance Schedule

Tasks to perform weekly, including drive belt checks and roller inspection.

Monthly Maintenance Schedule

Periodic checks and maintenance tasks performed monthly.

Other Maintenance Procedures

Specific procedures for replacing parts or adjusting chain play.

Lubrication Program

Guidelines for proper lubrication of the machine and its components.

Troubleshooting CMK Machine Issues

Alarm Banner Information

How alarm messages are displayed on the operator interface.

Active Alarm Screen

Display of active alarms and warnings, including their status.

Alarm History Screen

Access to a log of cleared alarm messages with timestamps.

Alarms and Warnings Reference

List of common alarms, their possible causes, and solutions.

ROVEMA CMK Specifications

General IconGeneral
ModelCMK
ManufacturerROVEMA
Packaging MaterialPaper
Bag Width50 - 250 mm
Power Supply50/60Hz
Compressed Air6 bar