Rovema CMK Operator’s Manual
Section 8: Maintenance
200246 CMK Operators Manual (02/06/2006) 8-7
Weekly Maintenance
Overview of the weekly maintenance plan:
• B1: Clean, check and retighten the belts as necessary.
• B2: Clean, check and retighten chains as necessary.
• B3: Clean the air filter on the blower.
• B4: Check the central lubrication oil level.
• B5: Check the oil level on the main gear unit.
• B6: Perform maintenance on the gluing unit per the manufacturer’s instructions.
• B7: Clean all guides.