Rovema CMK Operator’s Manual
Section 8: Maintenance
200246 CMK Operators Manual (02/06/2006) 8-9
Monthly Maintenance
Overview of the monthly maintenance plan:
C1: Clean, check and adjust the tension on the conveyors and conveyor belts, if
necessary.
C2: Clean, check and retighten chains, if necessary.
C3: Perform maintenance on the gluing unit per the manufacturer’s instructions.
C4: Check all connections that may become loose, like screw and bolts.
C5: Check the protective equipment including the Emergency Stop buttons and guard
door safety switches.
C6: Check all bearings for ease of motion.
C7: Check the air filter for the blower and replace, if necessary.
C8: Lubricate the main shaft, if needed.
C9: Check ventilation in the electrical cabinet.
C10: Check the warning signs on the machine to make sure they are visible.