16 Special Functions
16.2 Batch Schedule
221
GC-2014
16.2.4 Creating a new batch schedule
Select [New] (PF menu) from the batch schedule screen to display the new batch schedule
screen shown in Fig. 16.2.2.
Set an item using the [ △ ] and [ ▽ ] keys and [ENTER] key. When [Finish] (PF menu)
becomes available and the items have been set, press [Finish] to validate the schedule.
At the top of the screen, the contents of the set schedule are displayed. At the bottom of the
screen, the schedule can be edited.
Up to 100 lines are available per schedule.
Fig. 16.2.2 New batch schedule screen