EasyManuals Logo

Shimadzu GC-2014 Instruction Manual

Shimadzu GC-2014
318 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #235 background imageLoading...
Page #235 background image
16 Special Functions
16.2 Batch Schedule
223
GC-2014
16.2.6 PF menu
16.2.7 Editing a batch schedule
To change an existing batch processing schedule, move the cursor using the [ ] and [ ]
keys to the schedule to be edited and press the [ENTER] key. The schedule to be edited
appears on the edit screen.
To change the vial number, enter the new number from the edit screen and press [Finish]
(PFmenu).
To change the other parameters, move the cursor and make the change from the edit
screen, and then press [Finish] (PFmenu).
To cancel the edits and restore the original batch schedule, press [Cancel] (PFmenu) before
pressing [Finish](PFmenu).
PF menu Description
Reference
section
Finish Validates the schedule.
――
Prev Page Returns to previous setup screen.
――
Next Page Moves to setup screen for next item.
――
Cancel Cancels the schedule being created.
――

Table of Contents

Other manuals for Shimadzu GC-2014

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Shimadzu GC-2014 and is the answer not in the manual?

Shimadzu GC-2014 Specifications

General IconGeneral
TypeGas Chromatograph
DisplayLCD
Maximum Heating Rate120°C/min
Data AcquisitionDigital
Maximum Number of Detectors4
WeightApprox. 45 kg
Carrier GasHelium, Nitrogen, Hydrogen
Detector OptionsFID, TCD, ECD, FPD
Injection PortSplit/Splitless, On-column
Gas ControlElectronic Flow Control (EFC)
Temperature Programming Rate0.1 to 120 °C/min
Power Requirements230 V AC, 50/60 Hz
Detector Temperature RangeUp to 400°C (depending on detector type)

Related product manuals