EasyManua.ls Logo

Shimadzu GC-2014 - Service and Maintenance; Screen Description; Parameter List

Shimadzu GC-2014
318 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
255
16 Special Functions  
16.7
16.
GC-2014
16.7Service and Maintenance
16.7.1 Screen description
Select “7. SERVICE/MAINTENANCE” from the [FUNC] key screen to display the Service/
Maintenance screen shown in Fig. 16.7.1.
16.7.2 Parameter list
INSTALLATION (POSITION)
Specify the heated zone locations for installed components.
INSTALLATION (PIPING)
Set the installation status of the carrier gas and the detector gas flow controllers.
INITIALIZE
Initialize the RAM, configuration, and installation settings.
POWER CONSUMPTION
Displays the power consumption of all heated zones.
SERVICE
Reserved for the use of shimadzu service personnel during maintenance or inspections.
Fig. 16.7.1   Service/maintenance menu screen

Table of Contents

Other manuals for Shimadzu GC-2014

Related product manuals