9.4.3 Replacing the DynamicLoM module
9.4.3.1 Preliminary steps
Ê "Disabling SVOM boot watchdog functionality" on page 72
Ê "Shutting down the server" on page 48
Ê "Disconnecting the server from the mains" on page 49
Ê "Getting access to the component" on page 49
Ê Remove riser module 2 and riser module 3 as described in section
"Removing a riser module" on page 62.
9.4.3.2 Removing the defective DynamicLoM module
Ê Remove the DynamicLoM module as described in section "Removing the
DynamicLoM module" on page 184. The three bolts remain installed.
9.4.3.3 Installing the new DynamicLoM module
Ê Install the DynamicLoM module as described in section "Installing the
DynamicLoM module" on page 180.
9.4.3.4 Concluding steps
Ê Install riser module 2 and riser module 3 as described in section "Installing
a riser module" on page 63.
Ê "Reassembling" on page 54
Ê "Connecting the server to the mains" on page 60
Ê "Switching on the server" on page 61
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tool: – Phillips PH1 / (+) No. 1 screw driver
– hexagon screw driver 5mm