EasyManuals Logo

Fujitsu PRIMERGY RX2530 M1 Upgrade And Maintenance Manual

Fujitsu PRIMERGY RX2530 M1
372 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #28 background imageLoading...
Page #28 background image
28 Upgrade and Maintenance Manual
RX2530 M1
Before you start
2.2 Average task duration
The average task duration including preliminary and concluding steps is
indicated at the beginning of each procedure next to the procedure class.
Refer to the following table for an overview of steps taken into account for
calculating the average task duration:
Hardware: 10 minutes
Step included Explanation
Server shutdown no
Shutdown time depends on hardware and
software configuration and may vary
significantly.
Software tasks necessary before
maintenance are described in section
"Starting the maintenance task" on page 71.
Rack removal,
disassembly
yes
making the server available, removing the
server from the rack (if applicable)
Transport no
Transporting the server to the service table
(where required) depends on local
customer conditions.
Maintenance
procedures
yes
maintenance procedures including
preliminary and concluding software tasks
Transport no
Returning the server to its installation site
(where required) depends on local
customer conditions.
Assembly,
rack installation
yes
reassembling the server, installing the
server in the rack (if applicable)
Starting up no
Booting time depends on hardware and
software configuration and may vary
significantly.
Table 1: Calculation of the average task duration

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2530 M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX2530 M1 and is the answer not in the manual?

Fujitsu PRIMERGY RX2530 M1 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY RX2530 M1
CategoryServer
LanguageEnglish

Related product manuals