13.2.1.4 Concluding steps
Ê "Installing the fan sponges" on page 67 (if applicable)
Ê "Reassembling" on page 54
Ê "Connecting the server to the mains" on page 60
Ê "Enabling SVOM boot watchdog functionality" on page 89
Ê "Using the Chassis ID Prom Tool" on page 98
Ê "Switching on the server" on page 61
Ê "Verifying system information backup / restore" on page 81
Ê "Resuming BitLocker functionality" on page 95
13.3 Front VGA board
13.3.1 Installing the front VGA board
13.3.1.1 Preliminary steps
Ê "Shutting down the server" on page 48
Ê "Disconnecting the server from the mains" on page 49
Ê "Getting access to the component" on page 49
Ê "Removing the front panel module" on page 275
Upgrade and Repair Unit
(URU)
Hardware: 10 minutes
Tools: Phillips PH1 / (+) No. 1 screw driver