EasyManuals Logo

Fujitsu PRIMERGY RX2530 M1 Upgrade And Maintenance Manual

Fujitsu PRIMERGY RX2530 M1
372 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #300 background imageLoading...
Page #300 background image
300 Upgrade and Maintenance Manual
RX2530 M1
System board and components
15.2.1.3 Concluding steps
Ê Dispose of the CMOS battery in accordance with local regulations
concerning special waste.
Ê Install the air guide on CPU 2 as described in section "Installing the CPU air
guides" on page 69.
Ê "Reassembling" on page 54
Ê "Connecting the server to the mains" on page 60
Ê "Switching on the server" on page 61
Ê "Verifying system information backup / restore" on page 81
Ê "Verifying the system time settings" on page 91
15.3 USB Flash Module (UFM)
15.3.1 Installing the UFM
15.3.1.1 Preliminary steps
Ê "Disabling SVOM boot watchdog functionality" on page 72
Ê "Suspending BitLocker functionality" on page 71
Ê "Shutting down the server" on page 48
Ê "Disconnecting the server from the mains" on page 49
Ê "Getting access to the component" on page 49
Ê If applicable, remove the riser module 3 as described in section "Removing
a riser module" on page 62.
Field Replaceable Unit
(FRU)
Hardware: 5 minutes
Software: 5 minutes
Tools: tool-less

Table of Contents

Other manuals for Fujitsu PRIMERGY RX2530 M1

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Fujitsu PRIMERGY RX2530 M1 and is the answer not in the manual?

Fujitsu PRIMERGY RX2530 M1 Specifications

General IconGeneral
BrandFujitsu
ModelPRIMERGY RX2530 M1
CategoryServer
LanguageEnglish

Related product manuals