Installation
4-19
L
EDSVS9332P-B EN 3.0
Type 9332
T1
T2
PE
U
VW
2
3
4
1
0
5
9300STD032
Fig. 4-12 Proposal for motor connection
PE threaded bolt
Connect motor cable to threaded bolts U, V, W.
Observe c orrect pole co nnection and maximum motor cabl e length.
Use cable clamps for strain relief of the motor cables. Fasten cable clamps with M4 12 mm screws.
Connect motor c able shield with a large surface to shield sheet and tighten with shield clamps and M5 x 12 mm screws.
The shielding of the motor cable is only required to comply with existing standards (e. g. VDE 0160, EN50178, EN61800-3).
If necessary, use cable tie for additional strain relief of the motor cables.
Connect cable for motor temperature monitoring to screw terminals T1 and T2.
Connect cable shield for motor temperature monitoring with a large surface to PE threaded bolt.