Crane operation
10.4 Operation of the rated capacity limiter
10 - 48 3 302 633 en Operating Instructions GMK5250L
27.09.2017
If you wish to also lift a load with the other hoist during subsequent crane
operation then you must first switch over the display appropriately.
G
Risk of accidents due to incorrectly entered reeving!
Check the displayed reeving after each switch over and enter the current
reeving if necessary.
In this way, you prevent the RCL from making calculations based on an
incorrect reeving value and the truck crane from becoming overloaded or
from overturning.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals