Rigging work
11.5 Starting the engine for driving for rigging work
11 - 24 3 302 633 en Operating Instructions GMK5250L
27.09.2017
Start the engine All activities and checks required to start the engine must be carried out
before starting the engine;
à p. 4 - 1.
• Wait until the lamps (1) and (2) illuminate.
If the lamp
(2) does not illuminate or flash after about 20 seconds, there is a
malfunction;
à p. 14 - 21.
• Press the button (3) once – the engine will start.
The following buttons are now active on the hand-held control:
– All buttons on the control panel (1).
– The function buttons (3).
– All buttons on the control panel (4).
– The button (6) for the horn on the carrier.
The
button (2) and button (5) are inactive.
The
Outrigger control units are locked after connection of the hand-held
control.
Switching off
the engine
If the engine was started with the hand-held control, you cannot switch off
it off at the ignition lock in the driver's cab.
• Press the button (1) once – the engine will switch off.