Rigging work
11.5 Starting the engine for driving for rigging work
11 - 24 3 302 633 en Operating Instructions GMK5250L
27.09.2017
Start the engine All activities and checks required to start the engine must be carried out
before starting the engine;
à p. 4 - 1.
• Wait until the lamps (1) and (2) illuminate.
If the lamp
(2) does not illuminate or flash after about 20 seconds, there is a
malfunction;
à p. 14 - 21.
• Press the button (3) once – the engine will start.
The following buttons are now active on the hand-held control:
– All buttons on the control panel (1).
– The function buttons (3).
– All buttons on the control panel (4).
– The button (6) for the horn on the carrier.
The
button (2) and button (5) are inactive.
The
Outrigger control units are locked after connection of the hand-held
control.
Switching off
the engine
If the engine was started with the hand-held control, you cannot switch off
it off at the ignition lock in the driver's cab.
• Press the button (1) once – the engine will switch off.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals