Rigging work
11.9 Rigging/unrigging the counterweight
11 - 68 3 302 633 en Operating Instructions GMK5250L
27.09.2017
As the crane operator
Use only the Raise/lower hoist or Raise/lower derricking gear movements for
setting down the counterweight.
Execute the movement as slowly as
possible.
Notify the rigging personnel if the superstructure need to be slewed for
positioning the counterweight.
Set down the counterweight section.
As the rigging personnel
Remove the lifting gear and set down the ends so that the clearance is
clearly visible to the crane operator.
Leave the slewing range of the counterweight and the load.
As the crane operator
Perform the Raise hoist movement at the lowest possible speed until the
lifting gear is free.
When unrigging As the crane operator
Lift the lifting gear over the counterweight section.
Now inform the rigging personnel that they can climb on the truck crane.
As the rigging personnel
Do not climb on the truck crane until permitted by the crane operator.
Sling the counterweight section at the provided slinging points.
As the crane operator
Wind on the hoist rope until the lifting gear is tensioned – do not continue
lifting the counterweight section.
As the rigging personnel
Leave the slewing range of the counterweight and the load.
As the crane operator
Lift the counterweight section off the counterweight platform.