Rigging work
11.10 Rigging work on the main boom
Operating Instructions GMK5250L 3 302 633 en 11 - 111
27.09.2017
Unreeving
hoist rope
• Pull out the rod (5).
• Remove the retaining pins and pull out the
rod (3). Push the bracket (4) to the rear.
Insert the rod (3).
• Fold down the plates (1); à p. 11 - 108.
• Remove the rope end fitting from the fixed
point (2) or (6).
• Unreeve the hoist rope.
Depending on the driving mode, you can:
– Fasten the hoist rope to the bumper;
à p. 11 - 101 or
– Pull out the rods (1) and (2) and roll the hoist
rope onto the drum.
• Secure the rods (1) and (2) using the
retaining pins.