Page #349 background imageLoading...
Page #349 background image
Chapter 8: Troubleshooting
331
RAID Level migration is
paused
Migration paused because of user intervention,
schedule or a higher priority background activity.
RAID Level migration is
resumed
Migration has resumed again after a pause.
RAID Level migration is
stopped
Migration stopped because of user intervention,
schedule or the logical drive was deleted or went
critical or offline.
RAID Level migration has
encountered a physical
disk error
Bad block found on a disk drive. Migration will finish.
Check the disk drive check table after migration and
replace disk drive as needed. See page 156 or
page 205.
RAID Level migration is
aborted due to an internal
error.
System resources are low. Reduce system load or
restart the VTrak. See page 119 or page 245.
RAID Level migration is
queued
Migration has been set manually or by schedule.
Migration has detected/
cleared stale NV
Watermark
Watermarks are progress markers left as the result of
interrupted RAID migrations. If the watermark was
cleared, migration should finish.
Array was incomplete due
to missing NV Watermark
RAID migration was interrupted by a shutdown. If
array is online, try migration again. If array is offline,
delete and recreate array. See page 144 or page 193.
Rebuild
Rebuild is started Result of settings or user action. Normal.
Rebuild is completed Normal.
Rebuild is paused Rebuild paused because of user intervention,
schedule or a higher priority background activity.
Rebuild is resumed Rebuild has resumed again after a pause.
Rebuild is stopped Rebuild stopped because of user intervention,
schedule or the logical drive was deleted or the target
disk drive encountered an error. If rebuild stopped by
user intervention, restart the rebuild. See page 148 or
page 196.
Rebuild stopped internally The logical drive is offline. See page 336.
Rebuild is aborted due to
an internal error.
System resources are low. Reduce system load or
restart the VTrak. See page 119 or page 245.
Rebuild is queued Rebuild has been set manually or by schedule.
Reported Event Corrective Action

Table of Contents

Other manuals for Promise Technology VTRAK E610f

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Promise Technology VTRAK E610f and is the answer not in the manual?

Promise Technology VTRAK E610f Specifications

General IconGeneral
BrandPromise Technology
ModelVTRAK E610f
CategoryStorage
LanguageEnglish

Related product manuals