EasyManua.ls Logo

ROVEMA CMK - Page 88

ROVEMA CMK
209 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Rovema CMK Operator’s Manual
Section 5: Operator Controls
200246 CMK Operators Manual (02/06/2006) 5-20
Bag Transfers Parameters - Continued
Parameter Description
BT Stage 1 Settling Time This is the amount of time, after the bag is detected by the
photo-eye, before Stage 1 opens to drop the stack to the next
stage.
BT Stage 1 Open Time This is the amount of time that the Bag Transfer Station slides
remain open while releasing product to the next Bag Transfer
stage location.
BT Stage 2 Settling Time This is the amount of time, after the previous drop gate opens,
before Stage 2 opens to drop the stack to the next stage.
BT Stage 2 Open Time This is the amount of time that the Bag Transfer Station slides
remain open while releasing product to the next Bag Transfer
stage location.
BT Stage 3 Settling Time This is the amount of time, after the previous drop gate opens,
before Stage 3 opens to drop the stack to the next stage.
BT Stage 3 Open Time This is the amount of time that the Bag Transfer Station slides
remain open while releasing product to the next Bag Transfer
stage location.
BT Stage 4 Settling Time This is the amount of time, after the previous drop gate opens,
before Stage 4 opens to drop the stack to the next location.
BT Stage 4 Open Time This is the amount of time that the Bag Transfer Station slides
remain open while releasing product to the next location.
Figure 5.25
Bag Transfer Parameter Descriptions - Continued

Table of Contents

Related product manuals