©2020 Baxter International Inc. 5- 41
Performing a Dynamic Assessment Test
While the Challenge is in progress, the Dynamic display shows a second graph being
drawn on the right side of the screen; on the left, a 3-minute countdown (min/secs) is
shown. See the example in Figure 5-36.
9. As soon as the countdown reaches zero, the Challenge is complete.
The system sounds a single beep.
A message confirms successful completion of the Test - see Figure 5-37.
Figure 5-36 PLR Test - Challenge in Progress
Challenge
Countdown
Challenge
Graph
Test
In Progress