EasyManua.ls Logo

baxter Starling - Figure 5-43 Bolus Test - Baseline Measurement in Progress; Figure 5-44 Bolus Test - Measure SVI Change

baxter Starling
266 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5-48 Starling Monitor - User Guide
Performing a Dynamic Assessment Test
As soon as the countdown reaches zero, Baseline measurement is complete.
The system sounds a single beep; the next instruction is displayed (Figure 5-44).
Note
In the event that the Baseline results are considered by the system to be unstable, a warning
message is displayed. The user has the option of nevertheless continuing to the Challenge stage, or
restarting the Test again from the Baseline stage.
Figure 5-43 Bolus Test - Baseline Measurement in Progress
Baseline
Countdown
Baseline
Graph
Test
In Progress
Figure 5-44 Bolus Test - Measure SVI Change

Table of Contents

Related product manuals