EasyManua.ls Logo

baxter Starling - Page 183

baxter Starling
266 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
©2020 Baxter International Inc. 5- 47
Performing a Dynamic Assessment Test
Note
In the event that during the last 3 minutes the monitoring results were stable, the following
message is displayed providing the user with the option to commence the Bolus Test from the
Challenge stage:
Tap
Yes
to confirm - the Challenge commences immediately (with the last 3 minutes becoming the
Baseline) - see page 5-49.
Otherwise, tap
No
and continue to Step 3 below.
3. As requested in Figure 5-42, instruct the patient to keep still for the next 3 mins, then
tap Next.
During this time, the system will obtain a Baseline for measurement.
While the Baseline measurement is in progress, the Dynamic display shows a graph
being drawn slowly from left to right, as well as a 3-minute countdown (min/secs). See
the example in Figure 5-43.

Table of Contents

Related product manuals