Deutz TCD 2015 - Setting Plunger Lift of Injection Pumps

Deutz TCD 2015
710 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
© 06/2006 8218-001
5/14
TCD 2015
Fuel system
W 07-06-04
6
z Read and note the measured value.
P07 19
© 40503-0
Setting plunger lift of injection pumps
z Remove turbocharger.
W 06-06-04
z Remove turbocharger (A-bank, Railway).
W 06-06-04
z Remove turbocharger (B-bank, Railway).
W 06-06-04
z Unscrew screws (1).
All injection pumps must be removed.
1
© 40504-0
z Unscrew all screws (3).
z Remove spacing sleeves.
z Unscrew all screws (2).
z Remove heat shield (1).
1
3
2
© 40517-0