TX300 S7 / RX350 S7 Upgrade and Maintenance Manual 605
Processors
11.2 Installing processors
V CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.2.1 Required tools
● Preliminary and concluding steps: tool-less
● Removing and installing the processor heat sink:
– Phillips PH2 / (+) No. 2 screw driver
● Installing the processor: tool-less
11.2.2 Preliminary steps
Before installing a processor, perform the following steps:
Ê Disable BitLocker functionality as described in section "Disabling BitLocker
functionality" on page 141.
Ê Disable boot watchdog functionality as described in section "Disabling
SVOM boot watchdog functionality" on page 142.
Ê Shut down the server as described in section "Shutting down the server" on
page 71.
Upgrade and Repair Units (URU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes