EasyManua.ls Logo

Fujitsu PRIMERGY TX300 S7 - Upgrading or Replacing Processors; Required Tools

Fujitsu PRIMERGY TX300 S7
962 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
TX300 S7 / RX350 S7 Upgrade and Maintenance Manual 629
Processors
Ê Reconnect the AC power cords to the power supply units and secure them
with PSU cable brackets as described in section "Connecting the server to
the mains" on page 133.
Ê If available, update the system board BIOS and the iRMC to the latest
version as described in section "Updating or recovering the system board
BIOS and iRMC" on page 147.
Ê Enable boot watchdog functionality as described in section "Enabling SVOM
boot watchdog functionality" on page 159.
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task, re-enable BitLocker as described in section "Enabling
BitLocker functionality" on page 165.
11.4 Upgrading or replacing processors
V CAUTION!
Processors are extremely sensitive to electrostatic discharge and must
be handled with care. After a processor has been removed from its
protective sleeve or from its socket, place it upside down on a
nonconducting, antistatic surface. Never push a processor over a
surface.
11.4.1 Required tools
Preliminary and concluding steps: tool-less
Removing and installing the processor heat sink:
Phillips PH2 / (+) No. 2 screw driver
Upgrading or replacing the processor: tool-less
Field Replaceable Units (FRU)
Average hardware task duration: 15 minutes
Average software task duration: 5 minutes

Table of Contents

Other manuals for Fujitsu PRIMERGY TX300 S7

Related product manuals