EasyManua.ls Logo

GE Vivid 7 - Page 254

GE Vivid 7
858 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
GE HEALTHCARE
DIRECTION FC091194, REVISION 11 VIVID 7 SERVICE MANUAL
3 - 130 Section 3-11 - Connectivity Setup - Software v2.x
3-11-10-7 Check the Connection to the DICOM Server (Ping) - Software v2.x
1.) After the system is rebooted, press CONFIG
(F2) and log on as adm, see 4-2-4 "Log On to the
System as ‘ADM’" on page 4-12.
2.) Enter the Connectivity screen.
3.) Select the VIEWS
tab and the DATAFLOW button and you will see all available data flows.
4.) Select the +
by the “DICOM Server” dataflow to see the contents of that dataflow. This dataflow has
one DICOM Server with Storage Service.
Two new lines will appear, DICOMSERVER and the name of the server (e.g. ProSolv server).
..
5.) Select DICOMSERVER to highlight the line, then Select the Check button.
You should get a green check mark.
This is a hardware “ping” indicating that you have contact with the DICOM server’s hardware. If you
get a red cross, double check cabling and TCPIP addresses).
NOTE: If the Check button fails directly, the AE Title is probably wrong.
If the Check button fails after a long time (corresponding to the timeout), the IP address or Port
Number is probably wrong.
6.) Select the next line (e.g. ProSolv server) to highlight, then Select CHECK
.
You should get a green check mark.
This is a DICOM “ping” indicating that you have contact with the DICOM server software. If you get
a red cross, double check AE Title and port number).
Figure 3-139 All Data flows - Select “DICOM Server”
Figure 3-140 Views and Dataflow Selections
VIEWS tab
DATAFLOW button
+
DICOM server
Storage service

Table of Contents

Related product manuals