RX2520 M4
Upgrade and Maintenance Manual 291
Figure 192: Installing the LTO (B)
Ê Thread all cables through the bay.
Ê Carefully push the front panel cage into its bay.
Figure 193: Installing the front panel module
Ê Take note of the marked recess in the locking lever (see close-up).