– In order to satisfy cooling requirements, populate memory channels on
alternating sides of the processor:
10.2 Installing memory modules
10.2.1 Preliminary steps
Ê "Suspending BitLocker functionality" on page 125
Ê "Disabling SVOM boot watchdog functionality" on page 127
Ê "Shutting down the server" on page 62
Ê "Disconnecting the server from the mains" on page 63
Ê When working on a rack-mounted server:
"Extending / removing the server from the rack" on page 64
Ê Bring the server to its horizontal position.
Ê Open the side / top cover as described in section "Opening the server" on
page 68.
Ê "Removing the system air duct" on page 81
Order CPU 1 CPU 2
1 Channel A Channel E
2 Channel C Channel G
3 Channel B Channel F
4 Channel D Channel H
Upgrade and Repair Unit
(URU)
Average task duration:
5minutes
Tools: tool-less