Figure 384: Closing socket release lever 1
Ê Close the socket release lever marked Open 1st (1) and latch it under the
load plate retention tab (2).
11.3.3 Concluding steps
Ê "Installing the system air duct" on page 83
Ê "Closing the server" on page 98
Ê When working on a rack-mounted server:
"Mounting the server in the rack" on page 115
Ê "Connecting the server to the mains" on page 118
Ê If available, update the system board BIOS and the iRMC to the latest
version as described in section "Updating or recovering the system board
BIOS and iRMC" on page 134.
Ê "Enabling SVOM boot watchdog functionality" on page 146
Ê If BitLocker functionality is used and has been disabled before starting the
maintenance task: "Resuming BitLocker functionality" on page 152