4.5 Opening the server
V CAUTION!
● Before removing or installing covers, turn off the server and all
peripheral devices. Also unplug all power cables from the outlet.
Failure to do so can cause electric shock.
● In order to comply with applicable EMC regulations (regulations on
electromagnetic compatibility) and satisfy cooling requirements, the
PRIMERGY TX300 S8 / RX350 S8 server must not run while the side
cover is removed.
● For further safety information, please refer to chapter "Important
information" on page 45.
● Only valid for the tower servers: Don't lift the server by its front
cover. There is a possibility that the HDD bay cover hook may break.
4.5.1 Rack model
4.5.1.1 Removing the top cover
Figure 12: Removing the top cover (rack server)