4. TSM Service Program 1/2010 4 - 96
BA-TE-DE08C M.KAY Dialog+ SW9xx_SM_Chapter 4-2-1_1_2010.doc/pdf <110301> yymmdd B. Braun Avitum AG
Dialog
+
SW 9.xx
Test Procedure Positive Test Pressure
• A positive pressure is built up with the FPE pump.
• The pump is stopped and the valves closed if the set-point pressure for PDA
= +400 mmHg is reached.
• The PDA reference value is stored after a wait state of 5 s.
• This reference value is compared with the actual value after 30 s.
• If the deviation is < 10 mmHg the next test step is performed.
Test Step 1 VLA, VEBK1/2, VABK1/2---------------- closed
Test Step 2 VLA, VDEBK1/2, VDABK1/2------------- closed
Note
Only if start pressure was positive
After the second test step a leak proof test of the membranes is performed. The
valves have the following position:
VDEBK/VABK:---------------------------- opened
VDABK/VEBK/VLA: ----------------------- closed
Test Step 2a
Note
Test step 2a and 2b only for HDF online machines.
VLA Air separator valve: ------------------ closed
VDFF DF filter valve: ---------------------- closed
VSB Substitution bypass valve: ------------ closed
VSAE Substitution connection inlet valve: - closed
Test Step 2b
VLA Air separator valve: ------------------ closed
VDFF DF filter valve : --------------------- closed
VSB Substitution bypass valve: ------------ closed
VSAA Substitution connection outlet valve: closed
Test Step 3 VLA, VDE, VDA ------------------------ closed
DF Filter
PEV*
SB2
SB1
RVUFP
FSU
VA
VSAE
VSB
PSABF
PSAUS
VSAA
VDFF
HDF Filter
HFB
VBE
DDE
VBP
B
C
FBK2
FBK1
V. D.
Z.D.
FVD
Air
RVFPA
LAFS
VLA
VDA
VABK2
VDABK2
VABK1
VDABK1
BK2
BK1
VEBK2
VDEBK2
VEBK1
VDEBK1
MS B K2
MS B K1
VDE
LA
UFP
SBS2
SBS1
BL
FPE
PDA
FPA
8
Di al yser
LVD
VD
M
8
TSDE
Fig.: Excerpt Flow Diagram for HDF Online