Maintenance
24-2
24.2 Maintenance Plan
The following tasks can be fulfilled only by professional maintenance personnel recognized by the Company. If the
following maintenance is required, please timely contact the maintenance personnel. Prior to test or maintenance,
the device must be cleaned and disinfected.
Test and Maintenance Items
Visual inspection and performance inspection
Before first use every day
Parameter module performance inspection
and calibration
1. When measurement inaccuracy is suspected
2. When the relative module is maintained or replaced.
3. At least once every year for CO
2
module and AG module
4. At least once every two years for other modules
Defibrillation Synchronization test
Perform safety inspection according to
GB9706.1/IEC 60601-1
1. When the power module is maintained or replaced
2. If the monitor has been dropped
3. At least twice every year or as required
Each time the monitor is used.
Before first use
When the recorder is maintained or replaced
After the initial installation
When the printer is maintained or replaced
1. After the initial installation
2. When the integrated device is maintained or replaced
1. After the initial installation
2. After the battery is replaced
Every three months or the battery running time has shortened
noticeably.
At least once every two years or as required.
At least once every two years or as required.
At least once every two years or as required.
At least once every two years or as required.
Mainstream and sidestream CO
2
calibration
and performance check
At least once every two years or when measurement inaccuracy
is suspected.
Refer to the battery-related chapter in this manual.