12 Maintenance
Maintenance plan overview
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
Page
12 - 7
Magnetic valve VRA
(leak test and replacement)
(R) *)
as
needed
Valve exchange at main valve block R
as
needed
Inspect/test cooling system
(pipework, hoses)
T
R
***)
Check coolant
(quality acc. to specification)
T
R
***)
Replace reactor filling when its capacity is
reduced or the time between regeneration
cycles gets shorter
(R) *)
as
needed
12.2.9 Glovebox
T: Test
C: Clean
R: Repair or replace
UNIT
Monthly
Quarterly
Semi-annually
Annually
Others
Clean H
2
O analyser C (C)
lates
t
Calibrate analysers (O
2
+ H
2
O) R *)
Clean condensing device at regeneration
outlet (optional)
(C)
Check to make sure that all connections
are tight and free of contamination and
damage
R
Perform complete leak test T (T)
Check general state of gloves and check
for tears
T