EasyManua.ls Logo

MBRAUN LABmaster pro sp - Transport, Installation and Commissioning; Transport; Important Transport Labels

MBRAUN LABmaster pro sp
302 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4 Transport, installation and commissioning
Transport
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
Page
4 - 1
4 Transport, installation and commissioning
4.1 Transport
The preparation of a MBRAUN system for transport should be handled by MBRAUN
technicians only. The transport of the system or any part of a multi-unit system should be
performed by a freight agency, which offers specialised transport capabilities.
4.1.1 Important transport labels
This way up fragile Keep away from
rain
Indicates the centre
of gravity
Optional for heavy load: indications of
side attachment points for hoists (red ar-
rows).
On packaging boxes, the pick-up side of
the load for a fork lift is marked (arrow in
the figure on the left).
Monitoring of tilt-sensitive loads with an
adhesive tilt watch label: if the black indic-
ator (arrow) in the middle of the label has
turned red, the load was strongly tilted
during transport.
Monitoring of shock-sensitive loads with
an adhesive shock watch label: if the
white indicator (arrow) in the middle of the
label has turned red, the item was subject
to a strong impact during transport.

Table of Contents