12 Maintenance
Completing maintenance
Page
12 - 20
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
12.6.9 Optional and 3rd party components
MBRAUN inert gas systems can be equipped with additional components, for example:
¡ Universal Gas Probe (UGP)
¡ Refrigerator, box cooling (GS-nn, RKI)
¡ Recirculation chiller (RCC 1000)
Observe the instructions for inspection and maintenance in the relevant optional compon-
ent chapters.
Components of 3rd party manufacturers
Some MBRAUN inert gas systems can be equipped with components from 3rd party
manufacturers, for example:
¡ Vacuum pump(s)
¡ Compressor(s) for system cooling
¡ Compressor(s) for freezers
¡ Pressure regulators
¡ Safety overpressure valves
¡ Frequency converter
The original supplier documentation is included in the scope of delivery (refer to Equip-
ment from other manufactures [}10 - 4]).
WARNING
3rd party documentation was disregarded
Risk of injury and damage!
Observe all technical documents of 3rd party manufacturers.
12.7 Completing maintenance
Follow-up
Connect the system to the power supply.
Switch the system on.
Function checks - with power supply
After completion of the inspection and maintenance work:
Perform functional tests, especially with valves and analysers,
Perform electrical test: measure the leakage current,
Perform leak test on the system
Electrical test
After each change to the electrical systems and after each maintenance and repair work,
an electrical test must be performed.