6 Operating mode principles
Service book
MB-20-G/MB-200G-W_MB-LABmaster_MB-200 MOD_TP700
Operating Manual - V5.0 - 04/2018 - STD
Page
6 - 1
6 Operating mode principles
6.1 Service book
With start of operation, MBRAUN recommends to set up a service and a maintenance
book. This is:
¡ to track the regeneration cycles
¡ to schedule the calibration cycles of analysers
¡ to schedule the maintenance intervals
6.2 Starting up the system
After it has been installed and commissioned, the system usually stays on so that a clean
inert gas atmosphere can be maintained.
Maintenance work, repairs or a change of process tools inside the glovebox, may involve
a shutdown (because the box pressure regulation is only deactivated in a shutdown) and
subsequently to a system restart.
► In this case, inertise the glovebox before restarting the system.
Prerequisites
¡ All required instructions in the previous chapters were followed.
¡ All supply lines, connectors and connections have been checked.
¡ The working gas connection has been made properly.
¡ The regeneration gas connection has been made properly.
¡ The electrical system is connected to an earthed power supply, and additional earth-
ing has been installed to the purifier body.
¡ Cooling water connection has been made properly.
¡ Exhaust line for exhausted regeneration gas has been installed properly.
¡ Exhaust discharge of the vacuum pump(s) has been installed properly.
¡ Exhaust lines for harmful substances, and/or environment and health protection are
connected to an in-house exhaust system.
¡ When using regenerative solvent filters connection to an explosion-proof exhaust sys-
tem is required.